UK based Piling and Foundations Contractor

Geotechnical

Pile Testing

Once a pile has been installed, the pile structure can be tested to ensure it is stable for development. The methods we use are:

Pile Integrity Testing

Technique

  • integrity testing
  • dynamic load testing
  • static load testing

We use specialist tools to obtain readings from the ground with indirect methods which include:

  • Short wave (ultrasonic) acoustic method
  • Long wave (sonic) acoustic method